Frequently Asked Questions

30 years of commitment to exceptional service

  • There are no demolition costs, you can customize colours, it performs better in the winter, it is more time efficient, and uses a recycled product.

  • The Rubber Stone needs 24 hours of curing time before being able to walk on it, and 72 hours of curing time before being driven on.

  • The Rubber Stone is a porous product, so it is not waterproof. However, it does help with immediate water runoff. Water will seep through if there is continuous rainfall or sitting water.

  • We typically install at 1/2 an inch for a tightly packed installation. We can go thicker if your project requires more fill in certain areas.

  • Rubber Stone is excellent to shovel snow from, and because of the rubber granules, it is also very slip resistant. We use a polyurethane-based binding agent in our installation process, which allows our product to flex with the shifting substrate.

  • Most jobs only take a day to complete.

  • The colours and binding agent are mixed on site. Then, the mix is hand troweled down onto the existing surface.

Our resurfacing products

Our surfacing products are designed for any region across North America. CMT Contracting & Rubber Stone and Sierra Stone ensure that your driveways, sidewalks, garages, pool areas (and so much more), are both beautiful and functional.

CMT Contracting & Rubber Stone logo
Sierra Stone logo with red text on a white oval background, surrounded by a blue and red border.
Rubber Stone logo with blue text and green design elements.

Get a quote today!